Case Study of Machining Improvement: Reduction through Jig Improvement for Labor-Saving Device Parts
By reviewing the processing engineering, we have reduced processing time by 35%! Here are examples of improvements in FA equipment parts.
We would like to introduce a case study of processing improvements for FA equipment parts that our company has implemented. We changed the vice clamps for processes 1 and 2 to a fixture that accommodates two pieces for each process. By reviewing the processing steps, we were able to reduce non-cutting time and tool change time, resulting in increased efficiency. 【Case Study】 ■Part: FA equipment part ■Material: A5052 ■Product dimensions: 20mm × 45mm × 70mm *For more details, please refer to the PDF document or feel free to contact us.
- Company:タアフ
- Price:Other